Calgary Zoo bridge on 12th Street S.E. to close permanently later this month - Action News
Home WebMail Saturday, November 23, 2024, 02:19 PM | Calgary | -11.9°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Calgary

Calgary Zoo bridge on 12th Street S.E. to close permanently later this month

The bridge that connects St. George's Island to the south bank of the Bow River will permanently close on March 29.

Replacement on its way as current bridge dates back to 1908

The 12th Street S.E. bridge is more than 100 years old. (Scott Dippel/CBC)

The bridge that connects St. George's Island to the south bank of the Bow Riverwill permanently close on March 29.

Rust has beeneating away at the underside of the bridge, which has been slated for replacement since 2014. It's been closed to regular traffic since last November, with only pedestrians allowed to use the crossing.

Construction on a replacement bridge is underway just west of the current steel truss span, which dates back to 1908.

Here is an artistic rendering of the 12th Street S.E. bridge replacement. (City of Calgary)

The city is hosting a bridge farewell celebration on April 22 from 1-3 p.m. More details on what the celebration will entail are expected in the coming weeks.

The new 12th Street bridge is expectedto open by the end of this year.

The total budget for the new bridge and the removal of the old span is $26 million.