3rd time's a charm? Yukon government to attempt another ice bridge at Dawson City - Action News
Home WebMail Tuesday, November 26, 2024, 01:21 PM | Calgary | -8.3°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
North

3rd time's a charm? Yukon government to attempt another ice bridge at Dawson City

After some frustrated attempts in recent years, the Yukon government will try again this winter to buildan ice bridge across the Yukon River at Dawson City.

Government's efforts to help nature along over the last 2 winters failed

A 'road closed' sign sits where the ice bridge to West Dawson is usually in place, in February 2019. An open lead of water can be seen in the background. (Meagan Deuling/CBC)

The Yukon government is going to give it another shot.

Plans are being made to try again andbuildan ice bridge across the Yukon River at Dawson City this winter something the government's tried and failed to do in recent years.

For years, the river would reliably freeze over on its own. The government would then build and maintain a sanctioned road crossing, to connect West Dawson tothe main town site.

That's not happening anymore, even in the darkest depths of winter.

"In the recent past, conditions and factors have changed such that the river has not entirely frozen over at the usual location," says the government's newly-submittedapplication to the Yukon Environmental and Socio-economic Assessment Board (YESAB).

"[The government] has been challenged to find methodologies and techniques to facilitate the formation of an ice bridge at this location. To date, and for a variety of reasons, none of the techniques and strategies have had a resounding success."

A webcam view from Dawson City on Thursday shows the river is still a long way from freezing over. (dawson.meteomac.com)

As HighwaysMinister Richard Mostyn memorably put ittwo years ago, "Mother Nature is sort of a fickle mistress."

Ice pans and 'vegetated booms'

This will be the third year the government may tryto help things along. In a submission to the Yukon Environmental and Socio-economic Assessment Board, the government says it's got a few strategies in mind.

Some of them have worked in the past for some creative local residents, but those makeshift crossings were never sanctioned by the government.

One idea is to cut off large ice pans upstream, and let them float down and lodge into place. Ice spray or snow-making machines would then be used "at a more enhanced level than in previous years," the YESAB application says, to thicken the ice.

One option is to use a 'vegetated boom' for example, a steel cable line with green trees attached across the open water to help ice form. (Yukon government)

Another option is to installa floating bridge or a "vegetated boom" for example, a steel cable line with green trees attached across the open water to help ice form. A similar boom without trees was tried last year, but it didn't work.

The government could also find a different spot to build its crossing, as local residents have also done in recent years. But the YESAB application says that's complicated because of land access and private property, and unknown river conditions in different areas.

The ferry crossing "remains the safest and most familiar and practical location at which to construct the crossing," it states.

The budget for the project has not been revealed. Last year, the government spent $150,000 before pulling the plug.

Officials willhold a technical briefing next week, to explain their plans. The YESAB application is open for public comment until Oct. 31.