Downtown sinkhole filled as investigation into cause continues - Action News
Home WebMail Tuesday, November 26, 2024, 10:13 AM | Calgary | -16.2°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Ottawa

Downtown sinkhole filled as investigation into cause continues

A sinkhole that was eight metres wide and 12 metres deep has been filled by crews with the Rideau Transit Group, but the City of Ottawa says work continues to return traffic and plumbing back to normal.

Tunnelling suspended because it's unsafe for workers to return underground

A sinkhole located on Waller Street near Laurier Avenue was filled about 24 hours after the road collapsed in downtown Ottawa. (Photo courtesy of City of Ottawa)

Rideau Transit Group crews have filled a large sinkhole at the construction site where crews are digging the eastern entrance to Ottawa's light rail tunnel.

The City of Ottawa says the hole, which was eight metres wide and 12 metres deep, was filled with concrete overnight.

An exact cause has not been revealed, but the road collapse is believed to be connected to the tunnelling operation.

According to deputy city manager NancySchepers, the road collapsed after a digging crewin the tunnel first noticed dirt falling into the tunnel at about 10 p.m. ET Thursday.

Thats where the excavator aroadheadercalled Crocodile Rouge was gouging the earth,Schepers said during a technical briefing on Friday.

By 1 a.m., alarge sinkhole had opened upon Waller Street. Nobody was injured.

Sewers still disconnected

On Saturday, workers are trying to restore power to traffic signals at the intersection ofLaurierAvenue and theTransitway, and expect to complete that work by Saturday evening.

For now, police continue to direct traffic as vehicles are being rerouted and one eastbound lane ofLaurieris closedbetween Queen Elizabeth Drive and Waller Street.

City staff said water is back at 50 Laurier Ave., but local sanitary and storm sewers wont be reconnected until next week after workers are allowed to return underground.

The large sinkhole has halted tunnelling work on the east portal of Ottawa's LRT project. (Fred Chartrand/Canadian Press)

Crews had begun24-hour tunnellingoperationson Wednesday, but tunnelling operations remain suspended and the investigation into the road collapse continues.