Bridge construction in North Lake taking longer than expected - Action News
Home WebMail Saturday, November 23, 2024, 01:40 AM | Calgary | -11.7°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
PEI

Bridge construction in North Lake taking longer than expected

Construction to replace a bridge inNorth Lake, P.E.I., has been delayed.

'It's a challenging site'

A six-kilometre detour has been put in place for motorists to get around the construction. (Brittany Spencer/CBC)

Construction to replace a bridge inNorth Lake, P.E.I., has been delayed.

The bridge, built nearly 50 years ago,connects the two sides of North Lake Harbour, and is an important passageway for both cars and boats in the area.

The construction project, which began in August,was originally expected to be complete byDec. 20.

But because of a combination of poor weather and traffic, the project's end date has been pushed to the spring, saidNeil Lawless, a bridge engineer with the province.

"It's a challenging site," Lawless said.

Closed to motorists

"There was boat traffic all throughout construction,also a tight real estate area, I'll say,to work within for the contractor to perform the construction," he said.

"We didn't have a lot of room to work with. The weather in North Lake, it's also challenging and just the geometry of the bridge."

Lawless saidthe bridge will be closed to motorists until April1 to protect the integrity of the bridge while the Department of Transportation waits for the Island's asphaltplants to open. A six-kilometre detour has been put in place for motorists, hesaid.

"What's left to be done is placeasphalt, which is rather difficult this time of year basically impossible," he said.

"And we have to install the traffic barrier on each side of the bridge and then pave the road leading up to the bridge on both sides," he said.

Lawless said the project has cost about $3.2 million.

More P.E.I. news

With files from Angela Walker